EngGeniousEngineering & Advisory
DOOR 2 · PROJECT MANAGEMENT SERVICES

Delay is a fact. Entitlement is a document.

(- Only one of them gets paid.)

We run the contract while the works run, and rebuild the record when it matters. For contractors, for employers, and as independent expert.

FIDIC Red / Yellow / SilverLOGIC Standard FormsBespoke Turnkey EPCEPCM Frameworks
INDEPENDENCE & EXPERIENCE

The Three Chairs

We have occupied all three positions in contentious megaproject disputes. Having drafted the defence against contractor claims, we know exactly where opposing counsel and delay analysts will probe your submission.

CHAIR 01

For Contractors

Building, serving and realising extension-of-time (EoT), prolongation, disruption, and quantum claims. Recovering what the contract provides when employer risks cause critical path overrun.

Realising what the contract provides
CHAIR 02

For Employers

Testing entitlement, procedural condition-precedent verification, and defending claims served on you. Formulating liquidated damages, back-charge assessments, and substantiated counter-claims.

Defending against unmerited exposure
CHAIR 03

As Independent Expert

Jointly appointed by parties or tribunals to determine entitlement on agreed terms of reference. Independent forensic delay and quantum determinations adhering strictly to the SCL Protocol.

Impartial arbitral and tribunal determinations
SERVICE ARCHITECTURE

What we do.

Eight core capabilities structured into two operational regimes:

Group A: Run It

CONTEMPORANEOUS CONTROLS

01. Contract Management

Full life-cycle contract administration from tender review to final account. Obligation mapping, drafting correspondence, variation administration, and strict notice and records discipline kept running alongside the works.

02. PMC & Project Controls

Schedule integrity auditing, earned value cost control, validation of Value of Work Done (VOWD), management dashboards, and contractor QA/QC tracking across complex multi-contract packages.

Group B: Recover It & Defend It

CLAIMS & DISPUTES
03
Entitlement & Records Review

Condition precedent audit and gate evaluation before spending.

04
Forensic Delay Analysis

TIA, contemporaneous windows, and as-planned vs as-built modelling.

05
Quantum & Prolongation

On-site overheads, head office allocation, and actual financial ledger reconciliation.

06
Claim Development & Drafting

Full nine-section evidentiary dossiers ready for determination.

07
Defence & Back-Charge Rebuttal

Employer-side defence, liquidated damages mitigation, and counter-claims.

08
Dispute Avoidance & Resolution

Early warning procedures, structured de-risking, and mediation support.

STRUCTURED DELIVERY

How a mandate runs.

Six sequential phases designed to preserve capital and test viability before formal adversary engagement:

Diagnostic Protection: “Phases 1 to 4 are diagnostic. If the claim is not worth serving, we will say so before you spend on it.”
Concurrence Guarantee: “Nothing is submitted to your counterparty until you have seen the strategy and concurred with it.”
PHASE 01

Documentation & Gate Review

Audit contracts, baseline native schedules, Sub-Clause 20.1 notices, and contemporaneous minutes. Evaluate condition precedents.

PHASE 02

Project Team & Site Walk-Down

Direct interviews with project managers, planners, and site supervisors. Aligning the physical reality on the ground with the file.

PHASE 03

Prescribed Forensic Delay Modelling

Execute delay modelling using the specific method the contract prescribes (TIA, Windows, As-Planned v As-Built).

PHASE 04

Strategy & SWOT Concurrence

We present our critical kill-layer findings, counter-claim exposure, and recommended recovery ranges for your concurrence.

PHASE 05

Claim Build & Drafting

Drafting the nine-section submission bundle, native schedule appendices, and financial ledger quantum substantiation.

PHASE 06

Negotiation & Realisation

Supporting bilateral commercial close-out discussions, Dispute Adjudication Board hearings, or arbitral proceedings to realise recovery.

EVIDENTIARY ARCHITECTURE

The Method, Shown.

The difference is not the argument. It is the file. We structure claims so the arithmetic closes effortlessly on its own.

Threshold Gate: Sections 1 to 3Sections 1 to 3 decide whether the claim is serviceable at all. If the condition precedent failed or the contract excludes the head of claim, proceeding directly to expensive forensic delay and quantum calculations is an exercise in futility.
SECTION 01Threshold Gate

Jurisdiction & Executive Summary

Contract identities, governing law, procedural milestones, and concise summary of relief claimed.

SECTION 02Threshold Gate

Procedural Compliance & Notice

Proof of timely Sub-Clause 20.1/20.2 notices, records agreements, and condition precedent compliance.

SECTION 03Threshold Gate

Contractual Allocation of Risk

Clauses relied upon, express employer obligations, risk-transfer provisions, and exclusion limits.

SECTION 04

Factual Chronology & Contemporaneous Log

Cross-referenced daily reports, minutes of meeting, transmittals, and site inspections.

SECTION 05

Approved Baseline & Programme State

Status of the accepted baseline, revisions, logic network integrity, and native data date.

SECTION 06

Forensic Delay Modelling (TIA / Windows)

Methodological insertion of delay events, critical path migration, and excusable delay determination.

SECTION 07

Disruption & Inefficiency Impact

Measured Mile or modified total cost analysis isolating employer-caused productivity loss.

SECTION 08

Prolongation & Quantum Formulation

Substantiated on-site overheads, head office allocation (Hudson/Emden/Eichleay), finance costs.

SECTION 09

Formal Relief Request & Appendices

Explicit declaration of days of extension and currency sums, accompanied by full audit trails.

Redacted Claim Build Extracts

Confidential

Realised claim architectures, window analysis spreadsheets, and quantum reconciliation files from multi-million dollar arbitrations. Redacted for privilege.

ENGAGEMENT MODES

How we engage.

Tailored to the scale of the mandate and the intensity of the contractual conflict:

01. On-Site, Partner Mode

Embedded alongside project management to manage live notices, monthly schedule updates, and variation logs as works proceed.

02. Off-Site, Consultant Mode

Retained to perform independent diagnostic audits, forensic schedule modelling, and claim drafting on a focused deliverable basis.

03. Independent Third-Party Expert

Jointly appointed by disputing parties or counsel to produce impartial delay and quantum determinations.

THE FIVE RECORD CATEGORIES

What we need from you.

To give you an honest view before either side spends on full drafting, we review five primary records:

1. Contract, amendments, appendiced specifications and risk allocation matrices.

2. Approved baseline schedule and monthly progress updates in native format (P6 .XER).

3. Contemporaneous daily logs, progress reports, minutes of meeting and site correspondence.

4. Formal notice letters served under Sub-Clause 20.1/20.2 and engineer determinations.

5. Direct cost ledgers, resource histograms, and audited site overhead records.

“A gap you tell us about is a strategy question. A gap we find late is a rejection.”

INDIVIDUAL TRACK RECORD

The record of our principals.

Attribution Footnote: The figures and matters below reflect the individual track records executed by our principals in their respective senior careers, presented with rigorous definitions. We do not aggregate individual records into unsupported firm totals.

Sanjeev Jha

Director, Contract and Commercial

30+ Experience
US$ 886.08m
Claims Built & Realised
US$ 68.58m
Claims Defended
US$ 7bn+
Post-Award Contracts Administered
US$ 2.4bn
Pre-Award Packages Taken to Award
Credentials & Standing
RICS membership in progress
Former Advisory Council member, World Commerce & Contracting (WCC)
Advising across FIDIC, LOGIC, EPCM and bespoke infrastructure regimes
Selected Anonymised Matters
Downstream Refinery Package DisputeRealised

Defended employer counter-claims and secured negotiated commercial settlement following structured six-link delay analysis and quantum substantiation.

Offshore Processing & Marine Terminal ExpansionSecured

Built comprehensive Extension of Time and prolongation cost claim arising from owner design changes, late vendor data and physical site obstructions.

Cross-Border Natural Gas Pipeline SystemSubmitted

Employer-side evaluation and formal rebuttal of contractor delay submission; defended against wrongful prolongation claims and established actual critical path delay.

Dheeraj Pandey

Lead, Project Controls & Delay Analysis

18+ Experience
4 Primary Methods
Core Delay Methodologies
TIA · Windows · As-Planned v As-Built
Delay Analysis Profile
18+ Years Track Record
Major Infrastructure Mandates
Mega-scale Energy & Civil
Project Controls Leadership
Credentials & Methodology
PMP (renewal in progress)
Specialist in SCL Delay and Disruption Protocol compliance
Expert forensic planner across Primavera P6 native schedules
Selected Anonymised Matters
Integrated Heavy Rail & Freight CorridorSecured

Forensic delay analysis resolving complex multi-party interfaces, utility diversions, and phased land handovers across multiple contract packages.

Thermal Power Island & Desalination FacilityRealised

Windows delay analysis evaluating contemporaneous schedule updates against baseline; resolved owner-caused turbine pedestal handover delays.

Mining Processing Plant & ConcentratorSubmitted

Impacted As-Planned analysis determining employer-risk event impacts on critical piping and mechanical erection sequences.

Specialist Network: For heavy multi-package arbitrations, we mobilise established independent forensic delay analysts, quantity surveyors, and construction counsel, assembled around the specific claim.
About the network →
THE CONTRACTS & CLAIMS REGISTER

Contract Musings

Formal contract-and-claims register. The situation, the rule that applies, the consequence, and the firm position. Never mixed with Capital Projects.

#ContractMusing#CaseStudy

The Longstop Letter: A Fictional Case Study in Delay, Notice and Termination

An employer is building an iron ore concentrator, Phase 2, in Veldora under a lump-sum EPC contract with Completion Dates and Longstop Dates. A 4-month employer site handover delay and contractor welder shortage run concurrently on the tailings plant.

(- The late notice did not create the delay, but it removed the contractor's best argument.)

7 min interactive case studyRead entry →
#ContractMusing#EoTReadiness

Application Readiness Review: Contractor's Extension of Time (EoT)

Contractor's multi-million dollar Extension of Time (EoT) Application across Onshore and Offshore contracts on an integrated infrastructure megaproject, with a target issue date of T (11 working days).

(- Meeting target date T is a resourcing and strategy decision before it is a legal one.)

9 min interactive reviewRead entry →
#ContractMusing#TimeBars

The Claim Does Not Fail on the Merits. It Fails at the Gate.

A contractor completes 18 complex site variations over fourteen months. The works were genuinely instructed by the engineer. The additional plant and overtime were spent. The physical delay to commissioning is beyond dispute.

(- You can argue prevention principle all the way to London or Dubai Court. The tribunal will still read the 28-day notice clause first.)

4 min readRead entry →
DIAGNOSTIC ENGAGEMENT

Send us one matter.

We offer a written view of entitlement, record gaps, and recoverable range before either side commits. No documents are uploaded through this website. Our initial discussion begins under mutual NDA.

Confidentiality notice: All discussions protected under UAE commercial privilege and reciprocal non-disclosure agreement.